Morocco’s “water highway” is a transfer between river basins. The Sebou–Bouregreg project links Garde Sebou and the Sidi Mohammed Ben Abdellah reservoir. This guide explains the 2023 start of operations and how to read figures on flow, volume and storage. A watershed is the area whose waters flow to the same watercourse or river system. The expression evokes an axis of great capacity.

At a glance

Contents

Identify the two river basins and receiving reservoir

A watershed is the area whose waters flow to the same watercourse or river system. Sebou and Bouregreg give their names to two distinct basins. When a project connects them, it moves water between spaces that do not naturally share the same outlet. The name of the work thus indicates the point of departure and the basin of destination.

The presentation file distinguishes Garde Sebou’s detention from the Sidi Mohammed Ben Abdellah dam, also abbreviated SMBA. In other documents, you will meet the name of the written dam with variants. Always check that it is the hold on the Bouregreg. A name may appear on a map without its use being the same in a technical presentation and in a landscape guide. FN-BTP · Projet Sebou–Bouregreg

The presentation evokes a logic of transfer in stages, with an urgent Sebou–Bouregreg slice. Other interconnection projects or extensions may be included in separate announcements. To find out what is described as in service, look for the band name, the date of the document, and the mention of a real start. A project definition may include phases that have not been completed at the same time.

To read a map of this infrastructure, first place the two basins and the arrival hold. Then take the time to spot the difference between a stream, a dam lake and a transfer line. These three elements have different functions. They sometimes find themselves on the same illustration, while they do not correspond to the same object in the field.

Why is it called a water highway?

The expression evokes an axis of great capacity. In the media, it makes a technical name such as "interconnection of Sebou and Bouregreg basins" more readable. The project uses hydraulic structures and pipes to transport water. It is therefore a different equipment from the Moroccan highway network, its tolls and its routes.

The connection with a motorway is useful if you imagine a connection between networks. It becomes misleading if you are looking for an exit, a speed of traffic or a rest area. For a road map, look for the ADM network and national roads. To understand the water, use a hydrographic chart and a document that identifies deductions. You will find the right answer faster by choosing the type of card according to your question.

Do not assume that a driving follows the entire route of a road you know. A simplified map will often bring the two basins together by one line, especially in a general public presentation. Interpret this trait as a relationship between works. If you want to explain the principle to a child, draw two tanks and an arrow between them before looking at a more detailed map.

Read the timeline of the 2023 start-up

Médias24 presented the transfer as finalized at the end of August 2023. The technical file submitted in May 2024 then gives several dates for commissioning during 2023. These dates explain why an article on start-up and a retrospective presentation can select separate milestones. The entry into service of a project may take steps before the reference capacity presented in the file. FN-BTP · Projet Sebou–Bouregreg · Médias24 · Transfert Sebou–Bouregreg

The technical document indicates a length of approximately 67 kilometres for the work presented. It also gives a figure of about 66 kilometres for some pipelines. Use the first as the order of magnitude of the set, and keep the second in the context indicated by the document. A difference between two numbers may come from what they measure, even when both appear in the same presentation.

The technical presentation gives the urgent phase a reference flow rate of 15 cubic metres per second. That figure describes capacity or a target in the document. It does not tell you how much water passed through in a month. Use a dated report with a period and a measured or calculated total for that question. FN-BTP · Projet Sebou–Bouregreg

Understand flow, volume and storage

A flow expresses a quantity of water per unit of time. In documents, cubic metres per second describe the speed of transfer at one moment or for a defined capacity. A total volume in cubic metres answers another question. It indicates the quantity that has been transiting for a period. To compare figures, start by identifying the unit and period.

Imagine a constant flow of 2 cubic meters per second for 10 seconds. The fictitious volume is then 20 cubic metres. This calculation gives the idea of the connection between flow and volume. For a real installation, the operation can vary or interrupt. It therefore takes cumulative measurements or a known operating time to arrive at a dated report.

The volume stored in the hold is yet another indicator. It depends in particular on what comes in, what comes out of it and what uses it. A transfer to a dam therefore does not allow the filling rate to be deduced from a single flow figure. Check dated measurements if you want to compare the evolution of a holdback or understand a variation observed during a trip.

Read the landscape around the project

From a public place, you can sometimes observe a hold or stream and link this landscape to the notion of a watershed. A view of the Sidi Mohammed Ben Abdellah Dam shows a storage place on the Bouregreg. The photograph does not necessarily show the interconnection itself. Write separately what you see and what you have learned in the technical documentation.

If you are preparing an exit near a dam, confirm that access is public and that the road is suitable for your vehicle. The works and their operating areas have their own rules of access. For an exit, choose a walk or observation point with clearly indicated access. Hydraulic functions are not valid for inspection or bathing purposes.

The Morocvia Guide on Dams presents the roles of several reservoirs, while that on the "water highway" follows the link between two basins. When you read them together, find out on a map what falls within a restraint, stream or transfer. If a bulletin announces a change, note whether it relates to a basin, a work or a specific period.

Compare an announcement with a dated report

The same file may indicate that the transfer connects two deductions, gives a reference flow rate and advances a cumulative volume at a specific date. Pick up each information on a different line. Then identify the measurement period, or its end date. A comparison between two balance sheets usually requires that it be known whether they cover the same work and comparable periods. A larger figure can simply cover more than months.

If you’re reading an ad on a nearby pool, look if it concerns the Sebou–Bouregreg or any other interconnection. The nickname is general enough to be used on several operations. A project described under study, a work in progress and a work put into service require different formulations. The first question is to identify the location, document and status of the project on the date cited.

You can make a school plan with a departure deduction, transfer direction and destination detention. Add one flow legend and another for the cumulative volume if you use a dated report. Keep aside any future phases. A scaleless diagram can explain the relationship between basins, but it does not tell what distance to travel by car or where to observe the works.

If your interest is in visits around Rabat or Kenitra, use the city map and destination guides as a complement. First, find the places that are accessible to the public. Then go back to the project documents to locate Sebou and Bouregreg. You can understand this relationship from the documents without going to the transfer equipment.

If an article links the project to the water supply of Rabat and Casablanca, check which stage of the process it means. The transfer takes water to a reservoir. Figures for water reaching the reservoir and figures for distribution to users refer to different operations. Read the source’s definition before you quote a volume or an effect.

A map can help with reading names as well as places. Write down the source basin, the receiving basin and the name of the reservoir before comparing two documents. If a chart mentions the Bouregreg while the text names the Sidi Mohammed Ben Abdellah reservoir, check the scale of each reference. A measurement for one structure and a description of an entire basin can refer to different areas.

Frequently asked questions

Can you drive on the “water highway”?

The term here refers to a hydraulic infrastructure. It concerns water transfer between basins. For a road accessible by car, use the road map and traffic information of the operator or competent authorities.

Does a flow rate determine the annual volume?

The flow rate presented in the file corresponds to the band and parameters indicated by the source. An annual total requires an operating balance over this period. Check the period, unit and nature of the number before comparing two ads.

Guides for each stop

Sources and checks